Monday, April 1, 2013

Finish West Point Bridge Design

 
 
 
 
Finish your West Point Bridge Design.  Remember to check the rubric.  Your Objectives are:
 
1. To ensure that the bridge can safely carry its own weight as well as the weight of a load (truck).
2. To keep the cost of the bridge as low as possible ($250,000).

Print out a copy of your bridge and attach to your worksheet and complete the 4 questions listed below.
 
Post your bridge design (Below are instructions as to how to save your bridge)
 
 After you have completed your Bridge Design we need to save it as an image.
1.  First, you need to print screen (PRT SC) – This takes a snapshot of the screen
            - If you are using the laptop hold down the fn key and press F10.
2.  Open up Microsoft PowerPoint
3.  Right Click the mouse and left click paste
 
 
4.  Right click on the image and left click save as picture
5.  Change the directory to your tech folder in My Documents
            And save the image in your portfolio page as Graffiti.
6.  Log into your Edublogs.org page
7.  Create new Post and title it West Point Bridge Design
10.  Upload your WPBD image. After upload scroll down and click insert image into text and click Publish
Congratulations you have just successfully created your name in graffiti creator, cropped an image in PowerPoint and saved as a picture and posted it on your Blog.